Showing posts with label home extension. Show all posts
Showing posts with label home extension. Show all posts

Thursday, 26 April 2012

pride and joy

i think the part of the extension most exclaimed about by any female visitors is the new pantry.  And I have to admit that I too get quite excited about this little place.  It is squeezed into the corner of the kitchen and has an almost full sized door. We did have an experiment as to how many people we could get into the larder and managed 4 almost adult sized. 



There are shelves along two of the walls and a little room left for hooks most likely for aprons but you never know it could be onions! The internal walls are painted white and the electricians even put me a light up in there.



It is marvellous having all my food stored in one place. All the Follies like seeing exactly what we have available to eat, though I am finding that the stash of treats gets eaten more quickly than in the past.

The pantry is the perfect display space for my tupperware
bought about 15 years ago from my Canadian friend
(do you still use your boxes Heather?)

Whilst using the internet to research the design of my pantry I came across a couple of pantry titled blogs which I've enjoyed.


Monday, 16 April 2012

frustrating

... well I clearly jinked things with my last post, as after high hopes for an end to the renovations, things have slowed down once more.

The report from the building control officer has forced a change to the external door to the utility room. Mr and Mrs Folly are both disappointed about this as we were re-using an old door from a doorway we bricked up and it linked the old and new parts of the house really well from the outside.


The utility room door we had hoped to use on the new extension
The existing door to the kitchen in an older part of the house


The plumber fitted the toilet and put some water in the bowl to test the joint and discovered a leak through a hairline crack in the side of the toilet bowl.  We have returned this to the store and now have to wait for a new one to be delivered.
The data points were eventually installed but when Mr Folly checked them with his data connection gadget he found that half of them didn't work.  We also seem to have lost the majority of our tv channels much to the younger follies disgust.

All of these issues are small problems and for that I must remind myself to be grateful but I am becoming increasingly aware that patience is not one of my virtues.

Wednesday, 11 April 2012

nearly there

we are so close now to the extended part of the house being ready to move into that it is hard to be patient.  Each day seems to bring painfully slow progress on small details. 



Today the worktop and sink were fitted in the utility room. We are pleased with the look and once the two washing machines and dryer are fitted I know that I will be spending alot of time in here.




All the electrics were connected today so we are able to switch lights and try out the electric fire in the room which has become known as 'the snug'.









Painting continues when there isn't too much dust being created and the woodwork upstairs now has the first coat of paint.

A definite improvement on a few weeks ago 


There are still a list of items to complete ...



- data connections are not yet wired up - particularly important for Mr Folly's computer cupboard.




- the shower works but there is as yet no enclosure to contain the water!












- there are doors to be waxed

















- and there are still a couple of holes in the floor to sort out

  • there are also a few building control technicalities which need to be sorted out before the project can be signed off.
We have chosen carpets for upstairs and once painting has finished we can have these fitted.  Downstairs the flooring has to wait until the scree has dried out a little and begun its curing process so we have delayed making any firm decisions about this.

I daren't ask about a new scheduled completion date as the answer might test my eagerness to the limit.

Saturday, 24 March 2012

a clear view

the windows in the extension were put into positions in January but we've had problems along the way and now it looks as if some of them will have to be removed.



As you can see the large french doors do not line up with the side windows. Purely a cosmetic consideration but more importantly we can't lock the doors.  We have had lots of men coming to take a view - the rep from the building suppliers came and took photographs, next the rep from the window company arrived and made notes. It seems they will fight out amongst themselves just who is at fault but whatever is decided we will be getting new windows.



Upstairs on the landing we will be following our planning guidelines and fitting obscured glazed windows. We had originally thought about having some sort of stained glass effect here but after talks with the planning department we are going with more of an etched glass look.  Yet again there have been hiccups here as it has taken quite some time for the Mr and Mrs Follies to agree on a design. We now have to see how this design is interpreted in real life and then send it for approval to the planning department.  Hopefully they will agree and we will have a clearer view of our completion date.
I love this view of the various rooftops along our short terrace.




Tuesday, 20 March 2012

catching up

an electrical disaster with the computer lead left me without means to charge my laptop. I wasn't too upset with the inconvenience whilst waiting for the new lead as with Mr Folly heavily into IT and 2 teenage follies with laptops I thought I would get plenty of opportunity to read e-mails and update my blog.  However, my alloted timeslot was minimal and once the necessities of banking, reading school newsletters and organising shopping deliveries were dealt with I found my screen time over and the loaned laptop whisked away.

Eventually the new electrical lead arrived and I did manage a little blog reading but all opportunities for taking photos and writing have been quickly obliterated as things are moving fast with the extension. Each night we have to make more decisions than we ever realised possible. Having chosen our internal doors we then had to choose hinges and door handles.  Even now I'm not really sure of the appropriate criteria for hinge choosing. My current night-time reading consists of catalogues and more catalogues though surely this must change soon. 


  • The bathroom is all chosen now.
  • We are trying out carpet samples for the bedroom - all the follies line up in their bare feet and have to approve the texture as well as colour. 
  • Plastering and painting are ongoing with heaters running overnight to encourage the drying process.
  • We are still considering the possibility of a butler sink in the utility room.
  • The walls of the pantry have gone up.
  • The picture rail has been ruled out and skirting boards lie across the floor ready for fixing.
Tomorrow Mr Folly leaves the country for 10 days and I am unsure whether this is going to make things easier for decision making or more complicated, but I'll be sure to let you know.

Saturday, 11 February 2012

A ROOF!

Thursday morning saw me celebrating with tea all round as the roof was completed. YIPPEE! Just in time for the snowfall Thursday night.  Now by the standards of those living in countries where snow lasts from November to May this was an insignificant amount, but even so I was relieved that we were weatherproof before snow fell.



On another positive note, we have windows along the upstairs hall corridor and windows in the two new bedrooms. 










The studwork for the new bathroom is also taking shape which reminds us that we need to choose and order our bathroom suite.

I can see the makings of a storage cupboard.  There are electric wires now trailing across ceilings indicating placements of light fittings and switches.







The negative side to all our gains is a dodgy phoneline. As slates progressed across the roof our telephone connection became intermittent. Finally things settled down and we were left with internet, the capacity to receive phonecalls sounding as if on apparatus from the early 1900's and the complete inability to  telephone out. Outward calls necessitate walking out into the middle of the field behind the house and using the mobile. In this chilly weather it's making for some very succinct conversations.

Sunday, 5 February 2012

Brrrrr

… the temperature’s dropped here in the south of the uk and coincidentally we have just had the roof removed from the whole of the house.






When it was time to think about joining the roof of the new extension to that of the old house it became apparent that the whole house needed a new roof!  Decisions, decisions – do we forego the kitchen and get the roof or wait and do a little patching until we have saved some more.  In the end we went with the sensible, though not exciting option, of a new roof and the kitchen will have to wait awhile.








So up with more scaffolding at the front of the house as well as the back.






Off with the old slates and on with the new felt and batons.




Next week we should see the new slates over the whole roof but until then we have to turn up the heating and hope the snow holds off.



Friday, 13 January 2012

Anyone for a cuppa


After 3 months the whole Folly family has become used to having the company of builders.  I have had to increase the milk delivery to cope with the number of cups of tea and 'builders biscuits' are regularly on the shopping list.  How handy too, for so many people to be around to take in the parcels and I can't begin to tell you how useful I find the skip on the driveway.

The rhythm of the day for Folly 4 has taken quite a different turn. When she wakes the first thing she asks is 'how many builders?'  Then, downstairs she makes the required amount of drinks.  After school the first thing she does is put the kettle on and again goes out to house how many cups of tea are needed. 

A change in rhythm has been forced upon Folly 1 and 3 as they have had to move out of their bedroom due to the removal of one wall.  Folly 3 has moved in with the parents and Folly 1 is now downstairs on the sofa bed. Both girls have adapted really well to the 'squash and squeeze' and the fact that their special belongings have been shared around all rooms of the house.

Of course the building works are not on schedule and we are not even halfway there yet so we await to see how long the spirit of adventure lasts!

Monday, 21 November 2011

Room with a view

Or not as the case may be!

Four weeks into our 17 week project and the foundations have been laid, drainage dug and refilled and the ground floor walls built. So far no major hiccups but I probably shouldn't speak too soon on that one.  With progresss as swift as this it was time for the scaffolding to go up.  And so it did last week.



Now although the 4 Miss Follies had managed to play on the digger and dumper I found that these machines had disappeared off site before I got my turn and I was adamant this would not happen with the scaffolding.  So Saturday afternoon found me shimmying up the scaffold ladder (actually it was more of a painful easing with Mr Folly standing guard at the bottom of the ladder as I have quite a fear of heights).  It was fantastic seeing our garden and the fields beyond from such a vantage point and we positioned ourselves strategically to get a feel of the view from the bedroom windows.

not bad


quite pretty



oh dear

This will be the view from the side bedroom window - imagine when this lilac is in leaf!  We hadn't thought about this at all when planning the positioning of windows and there isn't really anything we can do apart from a little pruning I suppose.  Fortunately this room will be double aspect and so will have a view across the playing fields too and so there will be plenty of light.

I think scaffold climbing will now be curtailed as Mr Folly goes off on his work travels for the next few weeks and I don't want to encourage 4 Follies up to the heights.

Monday, 31 October 2011

I can't quite believe


  • that our building work has started.
  • just how many cups of tea I have made over the past week.
  • that my builder is called Bob (though he does not wear orange checkered shirts).
  • the sight of four girls on Sunday morning climbing on diggers and dumpers in their pyjamas.
  • exactly how our garden looked before this project began.
  • how quickly the holes and trenches appeared.
  • that I am already having to think about where to positon radiators and lights.
  • how long we managed to ponder over whether to reposition a door (and in the end didn't).
  • that every night Bob reconfigured pipes and electric to enable me to use my washing machine.
  • we have another 16 weeks to go (if things run to schedule).